Basic setup
Basic setup is what you prepare before the first manufacturing order. You need a product that can be built, a recipe for it and the right warehouse steps. Costs then show up on each order.
In simple words: Product, recipe, warehouse steps. Then you can build.
Pages in this group
| Page | Read it to |
|---|---|
| Configure a product | Make a goods product ready for production and tracking |
| Bill of materials | Write the recipe: components, operations and rules |
| One-step manufacturing | Take parts from stock and put finished goods back directly |
| Two-step manufacturing | Pick the components first, then build |
| Three-step manufacturing | Pick, build, then store the finished goods |
| Manufacturing order costs | Read costs on the order and the BoM |
Suggested order
- Configure a product for the finished item and for each component.
- Write the bill of materials.
- Pick the warehouse steps you want.
- Create your first order from First steps.