Advanced configuration
Basic setup gets a product built. Advanced configuration describes how the work is done on the shop floor: where each step runs, how long it takes, in which order, and which parts of a bill of materials apply to which variant.
In simple words: Work centers are the places, operations are the steps, and dependencies are the order.
Open Manufacturing → Configurations.
Gate
Work Centers and Operations only appear when Work Orders is on in Manufacturing → Settings → Manage Operations. Dependencies need Work Order Dependencies too. See Manufacturing settings.
How the pieces fit together
Work center (a place: Assembly Station)
^
Operation (a step on a BoM: Assemble Components)
|
Bill of materials (BOM-MC-LAPTOP)
|
Manufacturing order -> one work order per operationEach operation belongs to one BoM and runs at one work center. When you confirm a manufacturing order, Aureus creates one work order for every operation of its BoM.
Pages in this group
| Page | What you learn |
|---|---|
| Work centers | Create a work center, set its working hours, capacity, efficiency and cost per hour. |
| Operations | Define routing steps, their duration, worksheet and work center. |
| Work order dependencies | Make one step wait for another. |
| BoM variants | Use a component or step for chosen variants only. |
Suggested order
- Create the work centers.
- Create the operations and attach each one to a BoM and a work center.
- Create a manufacturing order and watch the work orders appear.
The sample data in this guide has two work centers, Assembly Station and Quality & Packing. It also has two operations, Assemble Components and Test & Pack, both on BOM-MC-LAPTOP.