Maintenance
Maintenance keeps your machines, vehicles and office devices working. You list each piece of equipment once. When something breaks, or when it needs regular care, you raise a maintenance request and give it to a team. The request moves through stages until the job is done.
In simple words: Maintenance answers three questions: what do we own, what is wrong with it, and who is fixing it.
The whole maintenance flow
Every job follows the same path. Read it once, then use the tutorial to try it.
1. Set up → 2. Add equipment → 3. Report a problem → 4. Assign and process → 5. Close
↑ |
└── Preventive copy ←───┘- Set up. Check the stages, create a maintenance team and an equipment category. See Setup.
- Add equipment. Record the machine with its category, team, technician, vendor and warranty. For example, Hydraulic Press 200T.
- Report a problem. Create a maintenance request, such as Hydraulic press oil leak, and pick the equipment.
- Assign and process. Set the team, the responsible person, a scheduled date and a duration. Open the request, click Edit, choose In Progress on the stage bar and click Save changes.
- Close. Choose Repaired and click Save changes. This stage is flagged as done, so the request counts as closed.
The preventive loop. Some work repeats, such as a monthly oil change. Create a Preventive request and tick Recurrent. When you save it in a done stage, Aureus opens the next copy for you, so the care never gets forgotten.
TIP
New to the module? Follow First steps. It takes you from an empty setup to a repaired machine in nine steps.
Menus
The top bar of the Maintenance app has three menus.
| Menu | What it holds |
|---|---|
| Maintenance | Maintenance Requests (the list of jobs) and Maintenance Calendar (jobs by scheduled date) |
| Equipment | Every machine or device you track, with vendor, serial number, cost and warranty |
| Configurations | Stages, Teams and Categories, the building blocks of your setup |
Data that comes ready to use
A new installation includes this data, so you can start right away.
- One team: Internal Maintenance. New requests use it until you pick another team.
- Four stages, in this order:
| Stage | Done flag | Meaning |
|---|---|---|
| New Request | No | The problem is reported, nobody has started |
| In Progress | No | Someone is working on it |
| Repaired | Yes | The job is finished |
| Scrap | Yes | The equipment cannot be repaired |
You can rename, add or reorder stages later. See Stages.
Groups in this guide
| Group | What you learn |
|---|---|
| Get started | A complete first tutorial, from setup to a repaired machine |
| Setup | Teams, equipment categories and stages |
| Equipment | Add, find and archive equipment |
| Requests | Create, process and repeat maintenance jobs |
| Calendar | Plan and review scheduled jobs by date |