Timesheets
A timesheet entry records time one person spent on one task of a project. Every entry names a date, a person, a project, a task and a number of hours. Aureus adds these hours up for you, so each task shows how much time is spent, how much is left and how far along it is.
In simple words: A timesheet is a diary of who worked on what, and for how long. Aureus does the sums.
Use timesheets when you bill by the hour or compare planned and real effort. Skip them if you only need a task list. They are optional.
Open Project → Timesheets from the top bar of the Project app.
Before you start
Turn on Enable Timesheets and, for each project, Allow Timesheets. See Timesheet settings.
How hours roll up into a task
Each time you save or delete an entry, Aureus recalculates the task it belongs to. A sub-task is a smaller task inside a task. See Sub tasks. If the task is a sub-task, the parent task is recalculated too.
| Task value | What it means |
|---|---|
| Allocated Hours | The hours you plan for the task. You type this on the task. |
| Time Spent | Hours logged on this task only. |
| Time Spent on Subtasks | Hours logged on its sub tasks. |
| Total Time Spent | Time Spent plus Time Spent on Subtasks. |
| Remaining Time | Allocated Hours minus Total Time Spent. It can go below zero. |
| Progress | Total Time Spent divided by Allocated Hours, as a percentage. |
Example
The task Migrate CMS content in Website Revamp has 20 allocated hours. People logged 10 hours on it. Ava Lewis then logs 3 more hours with Log time. Its sub tasks Export legacy articles and Import and re-format media have 6 hours each.
- Time Spent is 13 hours.
- Time Spent on Subtasks is 12 hours.
- Total Time Spent is 25 hours.
- Remaining Time is minus 5 hours, because the task is over its plan.
- Progress is 125%.
TIP
If Allocated Hours is empty or 0, Progress stays at 0. Set the hours on the task first.
Pages in this group
| Page | What it covers |
|---|---|
| Timesheet settings | Do this first: switches, allocated hours, summary rows and progress colours |
| Log time | Add, edit and delete entries from the Timesheets page or from a task |
| Timesheet list and filters | Columns, the total row, grouping, filters and bulk delete |
Suggested order
- Turn on timesheets in settings.
- Allow timesheets on each project and set Allocated Hours on tasks.
- Log time as people work.
- Review the list and each task's progress.
Where timesheets appear in the project area
- The Timesheets tab at the bottom of the task View page. See Create a task.
- Time columns and Progress in the task list.
- Total Hours Spent and Top Assignees on the project dashboard.
- Allocated Hours and Remaining Hours on a project. See Create a project.